Task 5:
Grid interconnection of building integrated and other dispersed photovoltaic systems
home > tasks >
Last updated: 30 May 2004

Task 5 focuses on design and grid interconnection of building integrated and other dispersed photovoltaic systems The overall objective of Task 5, which was concluded in 2002, was to develop and verify technical requirements which will serve as the technical guidelines for grid interconnection with building integrated and other dispersed power systems. The development of these technical requirements include safety and reliable linkage to the electric grid at the lowest possible cost. The systems considered will be those connected with a low-voltage grid, which are typically of a size between one and fifty peak kilowatts. Its deliverables are associated in four categories:

The latest findings of the Task 5 activities were presented at the workshop "Impacts of PV Penetration in Distribution Networks" held on 24 and 25 January 2002.

Task 5 status reports can be found in the annual reports of the IEA  PVPS Programme:

[ Top ]


Publications

Probability of islanding in utility networks due to grid-connected photovoltaic power systems The following IEA  PVPS Task 5 reports have been published:

Besides, Task 5 organized an international workshop, which resulted in:

In case you are interested and want to order one or more of these publications, please contact your national participant of Task 5 or the operating agent of Task 5.
[ Top ]


Information

For information contact the former Operating Agent of Task 5 or the Task 5 Chairman:

You can also contact one of the former national participants of Task 5: Australia, Austria, Denmark, Germany, Italy, Japan, the Netherlands, Portugal, Switzerland, United Kingdom and the United States of America.