Workshop Presentations

filelist
    Document name Issue date Creator / Publisher Details
    Ascending
Descending
Ascending
Descending
Ascending
Descending
 
211Workshop 2011 Task 14 Portugal Iain MacGillWorkshop 2011 Task 14 Portugal Iain MacGill2011/07/07IEA PVPS Task 14  /  IEA PVPS Task 14
212Workshop 2011 Task 14 Portugal Joao MacielWorkshop 2011 Task 14 Portugal Joao Maciel2011/07/07  /  
213Workshop 2011 Task 14 Portugal Ben KroposkyWorkshop 2011 Task 14 Portugal Ben Kroposky2011/07/07IEA PVPS Task 14  /  IEA PVPS Task 14
214Workshop 2011 Task 14 Portugal Jorge HidalgoWorkshop 2011 Task 14 Portugal Jorge Hidalgo2011/07/07IEA PVPS Task 14  /  IEA PVPS Task 14
215Workshop 2011 Task14 Portugal Carlos Mateo DomingoWorkshop 2011 Task14 Portugal Carlos Mateo Domingo2011/07/07IEA PVPS Task 14  /  IEA PVPS Task 14
216Workshop 2011 Task 14 Portugal AgendaWorkshop 2011 Task 14 Portugal Agenda2011/07/07IEA PVPS Task 14  /  IEA PVPS Task 14
217PV pumping economics - lessons from Australia (irrigation, drinking water, stock)PV pumping economics - lessons from Australia (irrigation, drinking water, stock)2011/06/02G. Stapleton, Global Sustainable Energy Solut  /  IEA PVPS Task 9
218Eco Grid EU, A Prototype for European Smart GridsEco Grid EU, A Prototype for European Smart Grids2011/06/02P. Ahm, PA Energy Ltd.  /  IEA PVPS Task 9
219Issues of programme financing and development - Hybrids and mini gridsIssues of programme financing and development - Hybrids and mini grids2011/06/02A. Shanker, Board Member ARE  /  IEA PVPS Task 9
220Example of a programme approach, Mini grid and connected PVExample of a programme approach, Mini grid and connected PV2011/06/02A. Shanker, Board Member - ARE  /  IEA PVPS Task 9
221Intro:  Mode de compatibilite Intro: Mode de compatibilite 2011/06/02A. Shanker, Board Member - ARE  /  IEA PVPS Task 9
222Abstract Workshop Hamburg 2011Abstract Workshop Hamburg 20112011/05/12IEA PVPS Task 1/ Pius Huesser  /  IEA PVPS Task 1
223Workshop Istanbul 2011 17 New forms of organisation for grid connected PV in the NetherlandsWorkshop Istanbul 2011 17 New forms of organisation for grid connected PV in the Netherlands2011/02/21Otto Bernsen, Senior project advisor  /  UFTP & IEA PVPS
224Workshop Istanbul 2011 16 Eco Grid EU - A Prototype for European Smart GridsWorkshop Istanbul 2011 16 Eco Grid EU - A Prototype for European Smart Grids2011/02/21Peter Ahm, PA Energy Ltd.  /  UFTP & IEA PVPS
225Workshop Istanbul 2011 15 PV inverters in a High PC Penetration scenario Workshop Istanbul 2011 15 PV inverters in a High PC Penetration scenario 2011/02/21Roland Bruendlinger, Operating Agent Task 14  /  UFTP & IEA PVPS

Total number of rows in list: 383

single view
Title:Task 7 of the IEA PV Power Systems Program Achievements and outlook
Issue date:2001/10/01
Description:Since January 1, 1997, Task 7 is active within IEA's PV Power Systems Program. Objective of Task 7 is to enhance the architectural quality, the technical quality and the economic viability of PV systems in the built environment and to assess and remove non-technical barriers for their introduction as an energy-significant option. Task 7 is an international collaborative programme, linking PV developments of Europe, the US, Japan and Australia to each other. The work in Task 7 concentrates on assisting the long-term development of building integrated PV, as well as on contributing to the short term marketing opportunities. The Task will be completed end of 2001. This paper presents information about the various achievements of the Task, as well as an outlook towards future international collaboration in the field of PV in the Built Environment.
Creator / Publisher:T. Shoen, D. Prasad, D. Ruoss, u.a.  /  IEA PVPS
Copyright:IEA PVPS
Filesize:300 Kilobyte
Filetype:pdf
Category:Paper
Conference
2001
Task 7
Public
Link:  
pap7_011_task 7_Oct._2001.pdf