Workshop Presentations

filelist
    Document name Issue date Creator / Publisher Details
    Ascending
Descending
Ascending
Descending
Ascending
Descending
 
316Performance of PV systems under real conditions Performance of PV systems under real conditions 2004/03/01T. Nordmann, U. Jahn, W. Nasse  /  IEA PVPS
317Performance analysis and reliability of grid-connected PV-systems in IEA countries Performance analysis and reliability of grid-connected PV-systems in IEA countries 2003/05/01U. Jahn, W. Nasse  /  IEA PVPS
318Understanding temperature effect on PV system performance  Understanding temperature effect on PV system performance 2003/05/01T. Nordmann, L. CLavadetscher  /  IEA PVPS
319Subsidies versus rate-based incentives for technology, economical and market development of PV. The European experience. Subsidies versus rate-based incentives for technology, economical and market development of PV. The European experience. 2003/05/01T. Nordmann  /  IEA PVPS
320Performance analysis of stand alone PV-systems from rational use of energy point of viewPerformance analysis of stand alone PV-systems from rational use of energy point of view2003/05/01D. Mayer, M. Heldenreich  /  IEA PVPS
321UNDERSTANDING TEMPERATURE EFFECTS ON PV SYSTEM PERFORMANCEUNDERSTANDING TEMPERATURE EFFECTS ON PV SYSTEM PERFORMANCE2003/05/01T. Nordmann, L. Clavadetscher  /  IEA PVPS
322Deployment of photovoltaic technologies: co-operation with developing countriesDeployment of photovoltaic technologies: co-operation with developing countries2002/10/01R. Gunning, J.R. Bates, B. McNelis  /  IEA PVPS
323Quality management of stand-alone PV systems: recommended practices     Quality management of stand-alone PV systems: recommended practices 2002/10/01A. Wilshaw, L. Southgate, R. Oldach  /  IEA PVPS
324Problems related to appliances in autonomous PV applicationsProblems related to appliances in autonomous PV applications2001/10/01X. Vallvé, G. Gafas, P. Jacquin, u.a.  /  IEA PVPS
325Task 7 of the IEA PV Power Systems Program Achievements and outlookTask 7 of the IEA PV Power Systems Program Achievements and outlook2001/10/01T. Shoen, D. Prasad, D. Ruoss, u.a.  /  IEA PVPS
326Deployment of photovoltaic technologies: co-operation with developing countries Task 9 of the International Energy Agency's Photovoltaic Power Systems ProgrammeDeployment of photovoltaic technologies: co-operation with developing countries Task 9 of the International Energy Agency's Photovoltaic Power Systems Programme2001/10/01R. Gunning, J.R. Bates, B. McNelis  /  IEA PVPS
327International Energy Agency PVPS Task II: Analysis of the operational performance of the IEA database PV systems International Energy Agency PVPS Task II: Analysis of the operational performance of the IEA database PV systems 2000/05/01U. Jahn  /  IEA PVPS
328Survey of stand-alone photovoltaic programmes and applications in developing countries Survey of stand-alone photovoltaic programmes and applications in developing countries 2000/05/01J.R. Bates  /  IEA PVPS
329Review of standards and quality assurance schemes for PV systems Review of standards and quality assurance schemes for PV systems 2000/05/01A.R. Wilshaw, J.R. Bates, R. Oldach  /  IEA PVPS
330Status report of Task VII of the IEA PV Power Systems Program Status report of Task VII of the IEA PV Power Systems Program 2000/05/01T. Schoen  /  IEA PVPS

Total number of rows in list: 334

single view
Title:Subsidies versus rate-based incentives for technology, economical and market development of PV. The European experience.
Issue date:2003/05/01
Description:Photovoltaic as a reliable and renewable power source is on its way from the “research laboratory” to real product and market. Different countries have different energy policies and different situation between the photovoltaic installation owners, the utilities and utility customers. The market development for a new product follows certain «rules of thumb» for the market introduction and penetration. The author has described this situation in the paper “success stories of photovoltaic financing in Europe” 1997. Six years later it is an opportunity to evaluate the improvements on the PV market development in Europe and elsewhere.
Creator / Publisher:T. Nordmann  /  IEA PVPS
Copyright:IEA PVPS
Filesize:575 Kilobyte
Filetype:pdf
Category:Paper
Conference
2003
Task 2
Public
Link:  
pap2_032_task 2_May_2003.pdf